Project Details
This page displays current information for project DEA: 072XL104.
Project Information
| Project Identifiers | Project ID: 995498 DEA: 072XL104 EFIS: 0724000158 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-10-14.23 |
| Award Date | 11/11/2023 |
| Closeout Date | 11/04/2025 |
| Work Description | LA-10, Construct temporary structural shoring - Column Casings Repair Work |
| Location Description | I-10 at Olympic Blvd |
| QA Service Level | 1 (Verified on 11/20/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Sepand.Minovi@dot.ca.gov | Sepand Minovi | Resident Engineer | Caltrans RE DB |
| Kwangsuk.Suh@dot.ca.gov | Suh Kwangsuk | Structural Representative | Caltrans SR DB |
| jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 13 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-11-17-25 | 11/17/2023 | 11/17/2023 | Per Request | SMTL TM5 - Headed Bars | View |
| 2023-11-17-43 | 11/17/2023 | 11/17/2023 | Per Request | SMTL TM6 - Ductile Iron Cast Samples | View |
| 2023-11-17-46 | 11/17/2023 | 11/17/2023 | Per Request | SMTL TM6 - Ductile Iron Cast Samples | View |
| 2023-12-14-34 | 12/14/2023 | 12/18/2023 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2024-02-02-12 | 02/02/2024 | Department Acceptance | Concrete | View | |
| 2024-02-13-35 | 02/13/2024 | 02/16/2024 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
| 2024-03-29-2 | 03/29/2024 | 04/03/2024 | Quality Assurance | SMTL TM5 - Couplers | View |
| 2024-03-29-3 | 03/29/2024 | Quality Control | SMTL TM5 - Couplers | View | |
| 2024-04-11-66 | 04/11/2024 | Department Acceptance | Concrete | View | |
| 2024-04-11-74 | 04/11/2024 | 04/30/2024 | Department Acceptance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
