Project Details
This page displays current information for project DEA: 043Y1304.
Project Information
Project Identifiers | Project ID: 995358 DEA: 043Y1304 EFIS: 0423000200 |
---|---|
DIST-CO-RTE-PM | 04-ALA-580-43.15/43.15 |
Award Date | 01/16/2023 |
Closeout Date | 08/13/2024 |
Work Description | Perform the application of Polyurethane Foam injection in lane #3, #4 and outside shoulder, clean drainage system and investigate for damage/blockage, install Slope Inclinometer to monitor slope movement, install RSP at the outfall |
Location Description | Not set |
QA Service Level | 1 (Verified on 01/08/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods