Project Details
This page displays current information for project DEA: 033H6104.
Project Information
Project Identifiers | Project ID: 995202 DEA: 033H6104 EFIS: 0318000019 |
---|---|
DIST-CO-RTE-PM | 03-PLA-80-42.7/49.3 |
Award Date | 02/15/2024 |
Closeout Date | Not set |
Work Description | RDWY EXC, HMA, JPCP, ALT PIPELINER, STEEL SOLDIER PILE, MOD LTG SYSTEM |
Location Description | PLACER COUNTY ABOUT 9.4 MILES NORTH OF COLFAX FROM 0.5 MILE WEST OF MONTE VISTA OVERCROSSING TO 0.3 MILE EAST OF DRUM FOREBAY OVERCROSSING |
QA Service Level | 1 (Verified on 11/13/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
tad.sampson@dot.ca.gov | Tad Sampson | Resident Engineer | Caltrans RE DB |
jimmer.ross@dot.ca.gov | Jimmer Ross | Structural Representative | Caltrans SR DB |
farzan.kazemi@dot.ca.gov | Farzan Kazemi | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 69 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-07-19-37 | 07/19/2024 | 07/20/2024 | Quality Control | Concrete | View |
2024-07-22-41 | 07/22/2024 | 07/23/2024 | Quality Control | Concrete | View |
2024-07-23-52 | 07/23/2024 | 07/24/2024 | Quality Control | Concrete | View |
2024-07-24-26 | 07/24/2024 | 07/25/2024 | Quality Control | Concrete | View |
2024-07-25-19 | 07/25/2024 | 07/25/2024 | Quality Control | Concrete | View |
2024-07-26-14 | 07/26/2024 | 07/26/2024 | Quality Control | Concrete | View |
2025-01-10-20 | 01/10/2025 | 01/10/2025 | Quality Control | Concrete | View |
2025-01-14-13 | 01/14/2025 | 01/14/2025 | Quality Control | Concrete | View |
2025-01-15-28 | 01/15/2025 | 01/15/2025 | Quality Control | Concrete | View |
2025-01-16-13 | 01/16/2025 | 01/16/2025 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods