Project Details

This page displays current information for project DEA: 033H6104.

Project Information

Project IdentifiersProject ID: 995202
DEA: 033H6104
EFIS: 0318000019
DIST-CO-RTE-PM03-PLA-80-42.7/49.3
Award Date02/15/2024
Closeout DateNot set
Work DescriptionRDWY EXC, HMA, JPCP, ALT PIPELINER, STEEL SOLDIER PILE, MOD LTG SYSTEM
Location DescriptionPLACER COUNTY ABOUT 9.4 MILES NORTH OF COLFAX FROM 0.5 MILE WEST OF MONTE VISTA OVERCROSSING TO 0.3 MILE EAST OF DRUM FOREBAY OVERCROSSING
QA Service Level1 (Verified on 11/13/2023)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
tad.sampson@dot.ca.govTad SampsonResident EngineerCaltrans RE DB
jimmer.ross@dot.ca.govJimmer RossStructural RepresentativeCaltrans SR DB
justin.palmaymesa@dot.ca.govJustin PalmaymesaMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 41-47 of 47 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2024-07-25-1907/25/202407/25/2024Quality ControlConcreteView
2024-07-23-3307/23/202407/26/2024Quality AssuranceSMTL TM5 - Threaded BarView
2024-07-23-3407/23/202407/26/2024Quality AssuranceSMTL TM5 - Threaded BarView
2024-07-26-1407/26/202407/26/2024Quality ControlConcreteView
2024-08-20-108/20/202408/26/2024Quality AssuranceSMTL TM5 - Threaded BarView
2024-09-25-7009/25/202410/01/2024Quality AssuranceSMTL TM1 - Elastomeric Bearing PadView
2024-09-30-2909/30/202410/01/2024Quality AssuranceHot Mix AsphaltView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods