Project Details
This page displays current information for project DEA: 07356604.
Project Information
Project Identifiers | Project ID: 995193 DEA: 07356604 EFIS: 0719000026 |
---|---|
DIST-CO-RTE-PM | 07-LA-605-R10.2/20.2 |
Award Date | 04/04/2024 |
Closeout Date | Not set |
Work Description | LANE & SLAB REPLACEMENT, COLD PLANE & HMA OVERLAY. |
Location Description | LOS ANGELES COUNTY IN SANTA FE SPRINGS, PICO RIVERA, WHITTIER, CITY OF INDUSTRY AND EL MONTE FROM TELEGRAPH ROAD UNDERCROSSING TO ROUTE 605/10 SEPARATION |
QA Service Level | 1 (Verified on 10/03/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jerome.g.arabe@dot.ca.gov | Jerome Arabe | Resident Engineer | Caltrans RE DB |
tien.chu@dot.ca.gov | Tien Chu | Structural Representative | Caltrans SR DB |
jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 104 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-02-19-30 | 02/19/2025 | 02/25/2025 | Verification | Aggregate | View |
2025-02-19-31 | 02/19/2025 | 02/25/2025 | Verification | Hot Mix Asphalt | View |
2025-02-19-32 | 02/19/2025 | 02/25/2025 | Verification | Asphalt Binder | View |
2025-02-19-34 | 02/19/2025 | 02/25/2025 | Verification | Asphalt Rubber Binder | View |
2025-02-19-36 | 02/19/2025 | 02/25/2025 | Verification | Crumb Rubber Modifier | View |
2025-02-19-37 | 02/19/2025 | 02/25/2025 | Verification | Crumb Rubber Modifier | View |
2024-09-12-45 | 09/12/2024 | 09/12/2024 | Quality Assurance | Concrete | View |
2024-09-12-46 | 09/12/2024 | 09/12/2024 | Quality Assurance | Concrete | View |
2024-09-24-19 | 09/24/2024 | 09/24/2024 | Quality Assurance | Concrete | View |
2024-09-25-45 | 09/25/2024 | 09/25/2024 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods