Project Details
This page displays current information for project DEA: 101E3004.
Project Information
Project Identifiers | Project ID: 995125 DEA: 101E3004 EFIS: 1018000273 |
---|---|
DIST-CO-RTE-PM | 10-SJ-5-32.5/49.8 |
Award Date | 01/12/2024 |
Closeout Date | Not set |
Work Description | REMOVE EXISTING PAVEMENT AND REPLACE WITH CONCRETE PAVEMENT. |
Location Description | SAN JOAQUIN COUNTY IN AND NEAR STOCKTON FROM 0.2 MILE SOUTH OF HAMMER LANE UNDERCROSSING TO SACRAMENTO COUNTY LINE |
QA Service Level | 1 (Verified on 09/26/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
ariel.mendoza@dot.ca.gov | Ariel Mendoza | Resident Engineer | Caltrans RE DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 145 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-03-25-76 | 03/25/2025 | 03/26/2025 | Quality Control | Concrete | View |
2025-03-25-75 | 03/25/2025 | 03/26/2025 | Quality Control | Concrete | View |
2025-03-24-107 | 03/24/2025 | 03/25/2025 | Quality Control | Concrete | View |
2025-03-26-85 | 03/26/2025 | 03/27/2025 | Quality Control | Aggregate | View |
2025-03-25-74 | 03/25/2025 | 03/26/2025 | Quality Control | Aggregate | View |
2025-03-24-106 | 03/24/2025 | 03/25/2025 | Quality Control | Concrete | View |
2025-03-24-105 | 03/24/2025 | 03/25/2025 | Quality Control | Aggregate | View |
2025-06-23-28 | 06/23/2025 | 06/24/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-06-23-27 | 06/23/2025 | 06/24/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-06-22-14 | 06/22/2025 | 06/24/2025 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods