Project Details
This page displays current information for project DEA: 060X3004.
Project Information
Project Identifiers | Project ID: 995124 DEA: 060X3004 EFIS: 0618000051 |
---|---|
DIST-CO-RTE-PM | 06-FRE-33-69.4/71.5 |
Award Date | 02/06/2024 |
Closeout Date | Not set |
Work Description | REPLACE ROADWAY PAVEMENT. |
Location Description | FRESNO COUNTY IN AND NEAR FIREBAUGH FROM MORRIS KYLE DRIVE TO LYON AVENUE |
QA Service Level | 1 (Verified on 10/25/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
din.dadawalla@dot.ca.gov | Din Dadawalla | Resident Engineer | Caltrans RE DB |
benjamin.holton@dot.ca.gov | Benjamin Holton | Structural Representative | Caltrans SR DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 128 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-06-06-15 | 06/06/2024 | 06/06/2024 | Acceptance | Soil | View |
2024-06-05-39 | 06/05/2024 | 06/06/2024 | Acceptance | Soil | View |
2024-06-07-3 | 06/07/2024 | 06/07/2024 | Acceptance | Soil | View |
2024-06-07-4 | 06/07/2024 | 06/07/2024 | Acceptance | Soil | View |
2024-06-07-33 | 06/07/2024 | 06/07/2024 | Acceptance | Aggregate | View |
2024-06-11-51 | 06/11/2024 | 06/11/2024 | Acceptance | Soil | View |
2024-06-24-1 | 06/24/2024 | 06/24/2024 | Acceptance | Soil | View |
2024-06-20-114 | 06/20/2024 | 06/20/2024 | Acceptance | Aggregate | View |
2024-06-25-84 | 06/25/2024 | 06/25/2024 | Acceptance | Aggregate | View |
2024-07-02-21 | 07/02/2024 | 07/02/2024 | Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods