Project Details
This page displays current information for project DEA: 060X3004.
Project Information
Project Identifiers | Project ID: 995124 DEA: 060X3004 EFIS: 0618000051 |
---|---|
DIST-CO-RTE-PM | 06-FRE-33-69.4/71.5 |
Award Date | 02/06/2024 |
Closeout Date | Not set |
Work Description | REPLACE ROADWAY PAVEMENT. |
Location Description | FRESNO COUNTY IN AND NEAR FIREBAUGH FROM MORRIS KYLE DRIVE TO LYON AVENUE |
QA Service Level | 1 (Verified on 10/25/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
din.dadawalla@dot.ca.gov | Din Dadawalla | Resident Engineer | Caltrans RE DB |
luis.guzman@dot.ca.gov | Luis Guzman | Structural Representative | Caltrans SR DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 81-90 of 184 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-05-01-26 | 05/01/2025 | 05/01/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-05-01-28 | 05/01/2025 | 05/01/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-05-02-7 | 05/02/2025 | 05/02/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-05-02-9 | 05/02/2025 | 05/02/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-05-05-18 | 05/05/2025 | 05/05/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-05-06-47 | 05/06/2025 | 05/06/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-05-06-48 | 05/06/2025 | 05/06/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-05-07-43 | 05/07/2025 | 05/07/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-05-08-41 | 05/08/2025 | 05/08/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-05-05-52 | 05/05/2025 | 05/05/2025 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods