Project Details
This page displays current information for project DEA: 07322904.
Project Information
Project Identifiers | Project ID: 995085 DEA: 07322904 EFIS: 0716000059 |
---|---|
DIST-CO-RTE-PM | 07-LA-27-0.0/18.6 |
Award Date | 11/06/2023 |
Closeout Date | Not set |
Work Description | REMOVE EXISTING AC PAVEMENT & HMA OVERLAY. |
Location Description | LOS ANGELES COUNTY IN AND NEAR LOS ANGELES FROM ROUTE 1 TO DEVONSHIRE STREET |
QA Service Level | 1 (Verified on 09/11/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
ravin.maru@dot.ca.gov | Ravin Maru | Resident Engineer | Caltrans RE DB |
jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 569 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-05-19-7 | 05/19/2025 | 05/19/2025 | Acceptance | Hot Mix Asphalt | View |
2025-05-12-50 | 05/12/2025 | 05/14/2025 | Acceptance | Hot Mix Asphalt | View |
2025-05-08-64 | 05/08/2025 | 05/12/2025 | Acceptance | Hot Mix Asphalt | View |
2025-05-08-63 | 05/08/2025 | 05/12/2025 | Acceptance | Hot Mix Asphalt | View |
2025-05-07-55 | 05/07/2025 | 05/14/2025 | Acceptance | Hot Mix Asphalt | View |
2025-05-08-54 | 05/08/2025 | 05/13/2025 | Production Start-Up | Hot Mix Asphalt | View |
2025-05-08-51 | 05/08/2025 | 05/13/2025 | Verification | Crumb Rubber Modifier | View |
2025-05-08-50 | 05/08/2025 | 05/13/2025 | Verification | Crumb Rubber Modifier | View |
2025-05-08-49 | 05/08/2025 | 05/13/2025 | Verification | Aggregate | View |
2025-04-29-65 | 04/29/2025 | 04/29/2025 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods