Project Details
This page displays current information for project DEA: 081G6404.
Project Information
Project Identifiers | Project ID: 995059 DEA: 081G6404 EFIS: 0816000046 |
---|---|
DIST-CO-RTE-PM | 08-SBD-395-R4.0/49.0 |
Award Date | 10/25/2023 |
Closeout Date | Not set |
Work Description | REPLACE ASPHALT CONCRETE SURFACING, COLD PLANE AC PVMT AND RHMA. |
Location Description | SAN BERNARDINO COUNTY AT VARIOUS LOCATIONS FROM ROUTE 15/395 SEPARATION TO 3.1 MILES NORTH OF ROUTE 58/395 SEPARATION |
QA Service Level | 1 (Verified on 08/15/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
shaun.loza@dot.ca.gov | Shaun Loza | Resident Engineer | Caltrans RE DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 238 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-08-29-58 | 08/29/2024 | 08/30/2024 | Acceptance | Aggregate | View |
2024-08-28-89 | 08/28/2024 | 08/29/2024 | Acceptance | Aggregate | View |
2024-08-28-88 | 08/28/2024 | 08/28/2024 | Acceptance | Aggregate | View |
2024-08-27-82 | 08/27/2024 | 08/28/2024 | Acceptance | Aggregate | View |
2024-08-27-81 | 08/27/2024 | 08/27/2024 | Acceptance | Aggregate | View |
2024-08-26-74 | 08/26/2024 | 08/27/2024 | Acceptance | Aggregate | View |
2024-08-24-18 | 08/24/2024 | 08/26/2024 | Acceptance | Aggregate | View |
2024-08-23-80 | 08/23/2024 | 08/26/2024 | Acceptance | Aggregate | View |
2024-08-23-79 | 08/23/2024 | 08/23/2024 | Acceptance | Aggregate | View |
2024-08-22-104 | 08/22/2024 | 08/22/2024 | Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods