Project Details
This page displays current information for project DEA: 120M82C4.
Project Information
Project Identifiers | Project ID: 994968 DEA: 120M82C4 EFIS: 1219000036 |
---|---|
DIST-CO-RTE-PM | 12-ORA-1-7.9/10.5 |
Award Date | 01/02/2023 |
Closeout Date | Not set |
Work Description | Place RHMA-G and minor concrete and modify electrical system. |
Location Description | In Orange County In Laguna Beach, On State Route 1 (Also Known As Pacific Coast Highway Or Sr-1) From Ruby Street (Pm 7.9) To Ledroit |
QA Service Level | 1 (Verified on 07/13/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
artin.merati@dot.ca.gov | Artin Merati | Resident Engineer | Caltrans RE DB |
danny.chung@dot.ca.gov | Danny Chung | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-18 of 18 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-10-15-42 | 10/15/2024 | 10/21/2024 | Verification | Crumb Rubber Modifier | View |
2024-10-15-47 | 10/15/2024 | 10/21/2024 | Verification | Asphalt Binder | View |
2024-10-21-45 | 10/21/2024 | 10/21/2024 | Verification | Asphalt Rubber Binder | View |
2024-04-22-114 | 04/22/2024 | 04/22/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-04-23-98 | 04/23/2024 | 04/23/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-04-24-94 | 04/24/2024 | 04/24/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-02-22-11 | 02/22/2024 | 02/23/2024 | Department Acceptance | Concrete Core | View |
2024-02-22-12 | 02/22/2024 | 02/23/2024 | Department Acceptance | Concrete Core | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods