Project Details
This page displays current information for project DEA: 073255U4.
Project Information
Project Identifiers | Project ID: 994966 DEA: 073255U4 EFIS: 0722000129 |
---|---|
DIST-CO-RTE-PM | 07-LA-605-20.2/26 |
Award Date | 04/12/2023 |
Closeout Date | Not set |
Work Description | INDIVIDUAL SLAB REPLACEMENT, COLD PLANE AC |
Location Description | LOS ANGELES COUNTY IN BALDWIN PARK AND IRWINDALE FROM ROUTE 10/605 SEPARATION TO 0.2 MILE NORTH OF ROUTE 210/605 SEPARATION |
QA Service Level | 1 (Verified on 07/13/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
steven.taing@dot.ca.gov | Steven Taing | Resident Engineer | Caltrans RE DB |
venkatesh.iyer@dot.ca.gov | Venkatesh Iyer | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 95 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-07-09-59 | 07/09/2025 | 07/14/2025 | Acceptance | Hot Mix Asphalt | View |
2025-07-08-1 | 07/08/2025 | 07/08/2025 | Acceptance | Hot Mix Asphalt | View |
2025-06-27-35 | 06/27/2025 | 06/30/2025 | Acceptance | Hot Mix Asphalt | View |
2025-06-26-79 | 06/26/2025 | 06/27/2025 | Acceptance | Hot Mix Asphalt | View |
2025-06-26-74 | 06/26/2025 | 06/27/2025 | Acceptance | Hot Mix Asphalt | View |
2025-06-24-64 | 06/24/2025 | 06/27/2025 | Acceptance | Hot Mix Asphalt | View |
2025-06-23-42 | 06/23/2025 | 06/25/2025 | Acceptance | Hot Mix Asphalt | View |
2025-06-20-52 | 06/20/2025 | 06/24/2025 | Acceptance | Hot Mix Asphalt | View |
2025-06-19-80 | 06/19/2025 | 06/24/2025 | Acceptance | Hot Mix Asphalt | View |
2025-06-18-111 | 06/18/2025 | 06/25/2025 | Verification | Asphalt Rubber Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods