Project Details
This page displays current information for project DEA: 073255U4.
Project Information
Project Identifiers | Project ID: 994966 DEA: 073255U4 EFIS: 0722000129 |
---|---|
DIST-CO-RTE-PM | 07-LA-605-20.2/26 |
Award Date | 04/12/2023 |
Closeout Date | Not set |
Work Description | INDIVIDUAL SLAB REPLACEMENT, COLD PLANE AC |
Location Description | LOS ANGELES COUNTY IN BALDWIN PARK AND IRWINDALE FROM ROUTE 10/605 SEPARATION TO 0.2 MILE NORTH OF ROUTE 210/605 SEPARATION |
QA Service Level | 1 (Verified on 07/13/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
steven.taing@dot.ca.gov | Steven Taing | Resident Engineer | Caltrans RE DB |
jeffrey.yu@dot.ca.gov | Jeffrey Yu | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 62 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-07-14-4 | 07/14/2024 | 07/14/2024 | Acceptance | Soil | View |
2024-07-12-24 | 07/12/2024 | 07/13/2024 | Acceptance | Soil | View |
2024-07-13-1 | 07/13/2024 | 07/13/2024 | Acceptance | Soil | View |
2024-07-09-126 | 07/09/2024 | 06/29/2024 | Quality Assurance | Concrete | View |
2024-06-29-14 | 06/29/2024 | 06/29/2024 | Quality Assurance | Concrete | View |
2024-06-28-98 | 06/28/2024 | 06/28/2024 | Quality Assurance | Concrete | View |
2024-06-28-99 | 06/28/2024 | 06/28/2024 | Quality Assurance | Aggregate | View |
2024-06-28-100 | 06/28/2024 | 06/28/2024 | Quality Assurance | Aggregate | View |
2024-06-28-104 | 06/28/2024 | 06/28/2024 | Quality Assurance | Concrete | View |
2024-06-21-79 | 06/21/2024 | 06/25/2024 | Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods