Project Details
This page displays current information for project DEA: 040Y1904.
Project Information
Project Identifiers | Project ID: 994730 DEA: 040Y1904 EFIS: 0422000255 |
---|---|
DIST-CO-RTE-PM | 04-SOL-37-R0.0/R7.4 |
Award Date | 06/27/2023 |
Closeout Date | 11/27/2024 |
Work Description | COLD PLANE ASPHALT CONCRETE PAVEMENT AND OVERLAY WITH RHMA-G. |
Location Description | SOLANO COUNTY IN AND NEAR VALLEJO FROM SONOMA COUNTY LINE TO NAPA RIVER BRIDGE |
QA Service Level | 1 (Verified on 05/10/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
Displaying 1-10 of 75 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-05-18-28 | 05/18/2024 | 06/06/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-05-11-13 | 05/11/2024 | 05/18/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-05-19-28 | 05/19/2024 | 05/19/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-05-18-27 | 05/18/2024 | 05/18/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-05-19-27 | 05/19/2024 | 05/19/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-05-19-26 | 05/19/2024 | 05/19/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-05-18-26 | 05/18/2024 | 05/18/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-05-19-25 | 05/19/2024 | 05/20/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-05-11-12 | 05/11/2024 | 05/11/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-04-21-14 | 04/21/2024 | 04/21/2024 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods