Project Details
This page displays current information for project DEA: 120T6604.
Project Information
Project Identifiers | Project ID: 994633 DEA: 120T6604 EFIS: 1222000076 |
---|---|
DIST-CO-RTE-PM | 12-ORA-74-0.0/5.3 |
Award Date | 03/22/2023 |
Closeout Date | 07/01/2024 |
Work Description | Cold plane AC pavement and place RHMA |
Location Description | Orange County in and near San Juan Capistrano from Route 5/74 Separation to Gibby Road. |
QA Service Level | 1 (Verified on 07/07/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
Displaying 1-10 of 19 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-11-14-94 | 11/14/2023 | 11/14/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-11-13-113 | 11/13/2023 | 11/13/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-11-12-5 | 11/12/2023 | 11/12/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-11-12-4 | 11/12/2023 | 11/12/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-11-08-117 | 11/08/2023 | 11/08/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-11-07-118 | 11/07/2023 | 11/07/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-11-06-89 | 11/06/2023 | 11/06/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-11-05-17 | 11/05/2023 | 11/05/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-11-02-79 | 11/02/2023 | 11/02/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-11-01-128 | 11/01/2023 | 11/01/2023 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods