Project Details
This page displays current information for project DEA: 100X7524.
Project Information
Project Identifiers | Project ID: 994455 DEA: 100X7524 EFIS: 1017000004 |
---|---|
DIST-CO-RTE-PM | 10-AMA-49-0.0/30.9 |
Award Date | 02/24/2023 |
Closeout Date | Not set |
Work Description | Bridge widening and upgrading rails |
Location Description | On State Highway in Amador and Calaveras Counties at Mokelumne River Bridge |
QA Service Level | 1 (Verified on 01/04/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
pawan.garg@dot.ca.gov | Pawan Garg | Resident Engineer | Caltrans RE DB |
braeden.anderson@dot.ca.gov | Braeden Anderson | Structural Representative | Caltrans SR DB |
andre.totari@dot.ca.gov | Andre Totari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-8 of 8 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-04-02-29 | 04/02/2024 | 04/03/2024 | Quality Assurance | Concrete | View |
2024-04-12-34 | 04/12/2024 | 04/15/2024 | Quality Assurance | Concrete | View |
2024-05-24-16 | 05/24/2024 | 05/28/2024 | Quality Assurance | Concrete | View |
2024-06-26-51 | 06/26/2024 | 06/27/2024 | Quality Assurance | Concrete | View |
2024-06-26-52 | 06/26/2024 | 06/27/2024 | Quality Assurance | Concrete | View |
2024-09-20-32 | 09/20/2024 | 09/23/2024 | Quality Assurance | Concrete | View |
2024-09-20-33 | 09/20/2024 | 09/23/2024 | Quality Assurance | Concrete | View |
2024-10-29-7 | 10/29/2024 | 10/29/2024 | Quality Assurance | Roadway/Bridge Surface | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods