Project Details
This page displays current information for project DEA: 053307C4.
Project Information
Project Identifiers | Project ID: 994443 DEA: 053307C4 EFIS: 0514000028 |
---|---|
DIST-CO-RTE-PM | 05-SLO-41,46-44.5/45.3,54.0/57.8 |
Award Date | 02/27/2023 |
Closeout Date | Not set |
Work Description | Wye Segment - Route 41/46 Separation |
Location Description | Not set |
QA Service Level | 1 (Verified on 12/16/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
brian.harrington@dot.ca.gov | Brian Harrington | Resident Engineer | Caltrans RE DB |
david.lewis@dot.ca.gov | Dave Lewis | Structural Representative | Caltrans SR DB |
saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 291-300 of 634 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-05-14-31 | 05/14/2025 | 05/13/2025 | Acceptance | Aggregate | View |
2023-10-10-48 | 10/10/2023 | 10/11/2023 | Department Acceptance | Concrete | View |
2023-10-10-49 | 10/10/2023 | 10/11/2023 | Department Acceptance | Concrete | View |
2023-10-10-76 | 10/10/2023 | 10/11/2023 | Department Acceptance | Concrete | View |
2023-10-10-77 | 10/10/2023 | 10/11/2023 | Department Acceptance | Concrete | View |
2024-05-23-92 | 05/23/2024 | 06/17/2024 | Dispute Resolution | Aggregate | View |
2024-09-03-64 | 09/03/2024 | 10/02/2024 | Dispute Resolution | Hot Mix Asphalt | View |
2024-07-18-132 | 07/18/2024 | 01/07/2025 | Dispute Resolution | Hot Mix Asphalt | View |
2025-01-20-19 | 01/20/2025 | 02/10/2025 | Dispute Resolution | Hot Mix Asphalt | View |
2025-01-20-20 | 01/20/2025 | 02/10/2025 | Dispute Resolution | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods