Project Details
This page displays current information for project DEA: 053307C4.
Project Information
Project Identifiers | Project ID: 994443 DEA: 053307C4 EFIS: 0514000028 |
---|---|
DIST-CO-RTE-PM | 05-SLO-41,46-44.5/45.3,54.0/57.8 |
Award Date | 02/27/2023 |
Closeout Date | Not set |
Work Description | Wye Segment - Route 41/46 Separation |
Location Description | Not set |
QA Service Level | 1 (Verified on 12/16/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
brian.harrington@dot.ca.gov | Brian Harrington | Resident Engineer | Caltrans RE DB |
david.lewis@dot.ca.gov | Dave Lewis | Structural Representative | Caltrans SR DB |
christopher.m.mcdermott@dot.ca.gov | Christopher McDermott | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 161-170 of 306 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-06-28-88 | 06/28/2024 | 06/29/2024 | Acceptance | Concrete | View |
2024-06-28-89 | 06/28/2024 | 06/29/2024 | Acceptance | Concrete | View |
2024-06-28-95 | 06/28/2024 | 06/29/2024 | Quality Control | Concrete | View |
2024-06-28-96 | 06/28/2024 | 06/29/2024 | Quality Control | Concrete | View |
2024-06-28-97 | 06/28/2024 | 06/29/2024 | Quality Control | Concrete | View |
2024-07-01-44 | 07/01/2024 | 07/01/2024 | Quality Control | Aggregate | View |
2024-07-01-90 | 07/01/2024 | 07/02/2024 | Acceptance | Concrete | View |
2024-07-01-104 | 07/01/2024 | 07/02/2024 | Quality Control | Concrete | View |
2024-07-01-105 | 07/01/2024 | 07/02/2024 | Quality Control | Concrete | View |
2024-07-02-55 | 07/02/2024 | 07/02/2024 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods