Project Details
This page displays current information for project DEA: 051K1204.
Project Information
Project Identifiers | Project ID: 994248 DEA: 051K1204 EFIS: 0518000125 |
---|---|
DIST-CO-RTE-PM | 05-SCR-9-1.0,4.0 |
Award Date | 12/07/2022 |
Closeout Date | Not set |
Work Description | CONSTRUCT SIDEHILL VIADUCTS. |
Location Description | SANTA CRUZ COUNTY AT 0.5 MILE NORTH OF VERNON STREET AND AT 0.8 MILE SOUTH OF GLENGARRY ROAD |
QA Service Level | 1 (Verified on 09/19/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
farshad.keshavarzi@dot.ca.gov | Farshad Keshavarzi | Resident Engineer | Caltrans RE DB |
jwilcenski@mnsengineers.com | James Wilcenski | Structural Representative | Caltrans SR DB |
kevin.couch@dot.ca.gov | Kevin Couch | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 125 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-12-05-18 | 12/05/2023 | 12/05/2023 | Acceptance | Roadway/Bridge Surface | View |
2023-02-08-2 | 02/08/2023 | 02/13/2023 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2023-05-25-37 | 05/25/2023 | 05/30/2023 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2023-05-25-38 | 05/25/2023 | 05/30/2023 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2023-05-03-63 | 05/03/2023 | 05/04/2023 | Quality Assurance | Aggregate | View |
2023-02-08-1 | 02/08/2023 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2023-04-14-41 | 04/14/2023 | 04/14/2023 | Quality Control | Aggregate | View |
2023-04-14-42 | 04/14/2023 | 04/14/2023 | Quality Control | Aggregate | View |
2023-04-14-43 | 04/14/2023 | 04/14/2023 | Quality Control | Concrete | View |
2023-04-17-39 | 04/17/2023 | 04/17/2023 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-9 of 9 results.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
SCS-EPD-06643 | Carbon Steel Rebar | EVRAZ North America | CMC Rebar (TAMMY ARAGON) | 252 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Mesa | CMC Rebar (TAMMY ARAGON) | 4635 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Mesa | CMC Rebar (TAMMY ARAGON) | 10861 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Mesa | CMC Rebar (TAMMY ARAGON) | 131912 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Durant | CMC Rebar (TAMMY ARAGON) | 5982 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Durant | CMC Rebar (TAMMY ARAGON) | 2991 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Durant | CMC Rebar (TAMMY ARAGON) | 36189 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Cayce | CMC Rebar (TAMMY ARAGON) | 446 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Seguin | CMC Rebar (TAMMY ARAGON) | 25698 LBS |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods