Project Details

This page displays current information for project DEA: 051K1204.

Project Information

Project IdentifiersProject ID: 994248
DEA: 051K1204
EFIS: 0518000125
DIST-CO-RTE-PM05-SCR-9-1.0,4.0
Award Date12/07/2022
Closeout DateNot set
Work DescriptionCONSTRUCT SIDEHILL VIADUCTS.
Location DescriptionSANTA CRUZ COUNTY AT 0.5 MILE NORTH OF VERNON STREET AND AT 0.8 MILE SOUTH OF GLENGARRY ROAD
QA Service Level1 (Verified on 09/19/2022)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
farshad.keshavarzi@dot.ca.govFarshad KeshavarziResident EngineerCaltrans RE DB
jwilcenski@mnsengineers.comJames WilcenskiStructural RepresentativeCaltrans SR DB
kevin.couch@dot.ca.govKevin CouchMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 125 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2023-12-05-1812/05/202312/05/2023AcceptanceRoadway/Bridge SurfaceView
2023-02-08-202/08/202302/13/2023Quality AssuranceSMTL TM5 - Welded HoopsView
2023-05-25-3705/25/202305/30/2023Quality AssuranceSMTL TM1 - Elastomeric Bearing PadView
2023-05-25-3805/25/202305/30/2023Quality AssuranceSMTL TM1 - Elastomeric Bearing PadView
2023-05-03-6305/03/202305/04/2023Quality AssuranceAggregateView
2023-02-08-102/08/2023Quality ControlSMTL TM5 - Welded HoopsView
2023-04-14-4104/14/202304/14/2023Quality ControlAggregateView
2023-04-14-4204/14/202304/14/2023Quality ControlAggregateView
2023-04-14-4304/14/202304/14/2023Quality ControlConcreteView
2023-04-17-3904/17/202304/17/2023Quality ControlAggregateView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Displaying 1-9 of 9 results.
Declaration NumberMaterial TypeVendorSubmitted byQuantity
SCS-EPD-06643Carbon Steel RebarEVRAZ North AmericaCMC Rebar (TAMMY ARAGON)252 LBS
EPD-191Carbon Steel RebarCMC - MesaCMC Rebar (TAMMY ARAGON)4635 LBS
EPD-191Carbon Steel RebarCMC - MesaCMC Rebar (TAMMY ARAGON)10861 LBS
EPD-191Carbon Steel RebarCMC - MesaCMC Rebar (TAMMY ARAGON)131912 LBS
EPD-191Carbon Steel RebarCMC - DurantCMC Rebar (TAMMY ARAGON)5982 LBS
EPD-191Carbon Steel RebarCMC - DurantCMC Rebar (TAMMY ARAGON)2991 LBS
EPD-191Carbon Steel RebarCMC - DurantCMC Rebar (TAMMY ARAGON)36189 LBS
EPD-191Carbon Steel RebarCMC - CayceCMC Rebar (TAMMY ARAGON)446 LBS
EPD-191Carbon Steel RebarCMC - SeguinCMC Rebar (TAMMY ARAGON)25698 LBS

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods