Project Details
This page displays current information for project DEA: 042J7404.
Project Information
Project Identifiers | Project ID: 994242 DEA: 042J7404 EFIS: 0415000010 |
---|---|
DIST-CO-RTE-PM | 04-SM-101-0.9/23.4 |
Award Date | 02/08/2023 |
Closeout Date | Not set |
Work Description | REMOVE BRIDGES (PORTIONS), BRIDGE BARRIERS, CONCRETE BARRIERS, & HMA. |
Location Description | SAN MATEO COUNTY AT VARIOUS LOCATIONS FROM UNIVERSITY AVENUE OVERCROSSING TO SIERRA POINT OFF RAMP OVERCROSSING |
QA Service Level | 1 (Verified on 09/28/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
peter.lam@dot.ca.gov | Peter Lam | Resident Engineer | Caltrans RE DB |
tyler.pinell@dot.ca.gov | Tyler Pinell | Structural Representative | Caltrans SR DB |
saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 13 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-09-03-31 | 09/03/2024 | Quality Control | Concrete | View | |
2024-09-05-43 | 09/05/2024 | Quality Control | Concrete | View | |
2023-04-06-60 | 04/06/2023 | 04/06/2023 | Quality Assurance | Rapid Set | View |
2023-07-21-30 | 07/21/2023 | 07/24/2023 | Quality Assurance | Concrete | View |
2023-08-24-54 | 08/24/2023 | 08/24/2023 | Quality Assurance | Concrete | View |
2023-09-21-42 | 09/21/2023 | 09/27/2023 | Quality Assurance | Concrete | View |
2024-03-06-19 | 03/06/2024 | 03/15/2024 | Quality Control | Concrete | View |
2024-03-14-36 | 03/14/2024 | 03/18/2024 | Quality Assurance | Concrete | View |
2024-03-08-44 | 03/08/2024 | 03/19/2024 | Quality Assurance | Concrete | View |
2024-03-20-18 | 03/20/2024 | 03/20/2024 | Quality Assurance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-1 of 1 result.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | Graniterock - District 4 (Rogelio Queja) | 88224 lb |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods