Project Details
This page displays current information for project DEA: 081C0814.
Project Information
Project Identifiers | Project ID: 993815 DEA: 081C0814 EFIS: 0816000086 |
---|---|
DIST-CO-RTE-PM | 08-RIV-10-R60.7/R74.3 |
Award Date | 03/28/2022 |
Closeout Date | Not set |
Work Description | I-10 PAVEMENT REHABILITATION (SEGMENT 1) PROJECT |
Location Description | Coachella |
QA Service Level | 1 (Verified on 05/03/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
peter.koury@dot.ca.gov | Peter Koury | Resident Engineer | Caltrans RE DB |
aalina@falcon-ca.com | Al Alina | Structural Representative | Caltrans SR DB |
jeffrey.yu@dot.ca.gov | Jeffrey Yu | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 101-110 of 525 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-08-04-106 | 08/04/2023 | 08/04/2023 | Quality Control | Aggregate | View |
2023-08-04-114 | 08/04/2023 | 08/05/2023 | Quality Control | Concrete | View |
2023-08-10-77 | 08/10/2023 | 08/10/2023 | Quality Control | Aggregate | View |
2023-08-10-78 | 08/10/2023 | 08/10/2023 | Quality Control | Aggregate | View |
2023-08-10-81 | 08/10/2023 | 08/11/2023 | Quality Control | Concrete | View |
2023-08-15-87 | 08/15/2023 | 08/15/2023 | Quality Control | Aggregate | View |
2023-08-15-90 | 08/15/2023 | 08/16/2023 | Quality Control | Concrete | View |
2023-08-18-101 | 08/18/2023 | 08/18/2023 | Quality Control | Aggregate | View |
2023-08-18-102 | 08/18/2023 | 08/19/2023 | Quality Control | Concrete | View |
2023-08-24-32 | 08/24/2023 | 08/28/2023 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods