Project Details
This page displays current information for project DEA: 081C0814.
Project Information
| Project Identifiers | Project ID: 993815 DEA: 081C0814 EFIS: 0816000086 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-10-R60.7/R74.3 |
| Award Date | 03/28/2022 |
| Closeout Date | Not set |
| Work Description | I-10 PAVEMENT REHABILITATION (SEGMENT 1) PROJECT |
| Location Description | Coachella |
| QA Service Level | 1 (Verified on 05/03/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| michael.sergah@dot.ca.gov | Michael Sergah | Resident Engineer | Caltrans RE DB |
| aalina@falcon-ca.com | Al Alina | Structural Representative | Caltrans SR DB |
| james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 151-160 of 602 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-10-02-37 | 10/02/2023 | 10/04/2023 | Department Acceptance | Hot Mix Asphalt | View |
| 2023-10-02-61 | 10/02/2023 | 10/04/2023 | Verification | Asphalt Binder | View |
| 2023-10-02-106 | 10/02/2023 | 10/03/2023 | Quality Control | Concrete | View |
| 2023-10-04-45 | 10/04/2023 | 10/11/2023 | Verification | Asphalt Binder | View |
| 2023-10-04-52 | 10/04/2023 | 10/13/2023 | Verification | Aggregate | View |
| 2023-10-06-82 | 10/06/2023 | 10/07/2023 | Quality Control | Concrete | View |
| 2023-10-06-83 | 10/06/2023 | 10/07/2023 | Quality Control | Concrete | View |
| 2023-10-09-35 | 10/09/2023 | 10/16/2023 | Quality Assurance | Concrete | View |
| 2023-10-09-90 | 10/09/2023 | 10/10/2023 | Quality Control | Concrete | View |
| 2023-10-10-107 | 10/10/2023 | 10/11/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
