Project Details
This page displays current information for project DEA: 081C0814.
Project Information
| Project Identifiers | Project ID: 993815 DEA: 081C0814 EFIS: 0816000086 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-10-R60.7/R74.3 |
| Award Date | 03/28/2022 |
| Closeout Date | Not set |
| Work Description | I-10 PAVEMENT REHABILITATION (SEGMENT 1) PROJECT |
| Location Description | Coachella |
| QA Service Level | 1 (Verified on 05/03/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| michael.sergah@dot.ca.gov | Michael Sergah | Resident Engineer | Caltrans RE DB |
| aalina@falcon-ca.com | Al Alina | Structural Representative | Caltrans SR DB |
| james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 471-480 of 602 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2024-05-17-74 | 05/17/2024 | 05/18/2024 | Quality Control | Concrete | View |
| 2024-05-17-75 | 05/17/2024 | 05/18/2024 | Quality Control | Concrete | View |
| 2024-05-31-53 | 05/31/2024 | 06/01/2024 | Quality Control | Concrete | View |
| 2024-06-07-100 | 06/07/2024 | 06/08/2024 | Quality Control | Concrete | View |
| 2024-06-12-99 | 06/12/2024 | 06/13/2024 | Quality Control | Concrete | View |
| 2024-05-23-103 | 05/23/2024 | 05/24/2024 | Quality Control | Concrete | View |
| 2024-06-13-103 | 06/13/2024 | 06/14/2024 | Quality Control | Concrete | View |
| 2024-06-13-104 | 06/13/2024 | 06/14/2024 | Quality Control | Concrete | View |
| 2024-06-14-63 | 06/14/2024 | 06/15/2024 | Quality Control | Concrete | View |
| 2024-07-18-22 | 07/18/2024 | 06/19/2024 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
