Project Details
This page displays current information for project DEA: 11056394.
Project Information
Project Identifiers | Project ID: 993705 DEA: 11056394 EFIS: 1117000151 |
---|---|
DIST-CO-RTE-PM | 11-SD-11-2.7 |
Award Date | 07/18/2022 |
Closeout Date | 06/03/2024 |
Work Description | CONSTRUCT DRAINAGE FACILITIES, RETAINING WALL AND EARTHWORK. |
Location Description | SAN DIEGO COUNTY NEAR SAN DIEGO AT 1.9 MILES EAST OF SANYO AVENUE UNDERCROSSING. |
QA Service Level | 1 (Verified on 05/04/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
michael.charak@dot.ca.gov | Michael Charak | Resident Engineer | Caltrans RE DB |
victor.yoon@dot.ca.gov | Victor Yoon | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-7 of 7 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-01-15-24 | 01/15/2024 | 01/16/2024 | Quality Control | Concrete | View |
2022-12-09-24 | 12/09/2022 | 12/09/2022 | Quality Assurance | Soil | View |
2022-12-02-15 | 12/02/2022 | 12/02/2022 | Quality Assurance | Soil | View |
2022-11-28-26 | 11/28/2022 | 11/28/2022 | Quality Assurance | Soil | View |
2022-11-22-43 | 11/22/2022 | 11/22/2022 | Quality Assurance | Soil | View |
2022-11-22-42 | 11/22/2022 | 11/22/2022 | Quality Assurance | Soil | View |
2022-09-19-38 | 09/19/2022 | 09/19/2022 | Quality Assurance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-1 of 1 result.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
4790066131.101.1 | Carbon Steel Rebar | Cascade Steel Rolling Mills, Incorporated | Amber Steel Company (Kriss Lewis) | 18,499lbs. 9 RELEASES |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods