Project Details
This page displays current information for project DEA: 073311U4.
Project Information
Project Identifiers | Project ID: 993664 DEA: 073311U4 EFIS: 0719000098 |
---|---|
DIST-CO-RTE-PM | 07-VEN-23,101-R3.3/R3.7,0.2/40.8 |
Award Date | 08/31/2022 |
Closeout Date | Not set |
Work Description | CONSTRUCT GUARDRAILS AND CONCRETE BARRIER. |
Location Description | VENTURA COUNTY IN THOUSAND OAKS, CAMARILLO, OXNARD AND VENTURA ON ROUTE 101 FROM THE LOS ANGELES /VENTURA COUNTY LINE TO OLD PACIFIC COAST HIGHWAY AND ON ROUTE 23 FROM ROUTE 23/101 SEPARATION TO HILLCREST DRIVE |
QA Service Level | 1 (Verified on 05/11/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 41-42 of 42 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-06-17-78 | 06/17/2024 | 06/20/2024 | Acceptance | Hot Mix Asphalt | View |
2024-06-19-68 | 06/19/2024 | 06/20/2024 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods