Project Details
This page displays current information for project DEA: 11430514.
Project Information
Project Identifiers | Project ID: 993529 DEA: 11430514 EFIS: 1119000008 |
---|---|
DIST-CO-RTE-PM | 11-SD-15-R31.3/R37.1 |
Award Date | 05/27/2022 |
Closeout Date | Not set |
Work Description | CRCP, FIBER OPTIC CABLE, AND HMA. |
Location Description | SAN DIEGO COUNTY IN AND NEAR ESCONDIDO FROM 0.2 MILE SOUTH OF ROUTE 15/78 SEPARATION TO 0.5 MILE NORTH OF DEER SPRINGS ROAD OVERCROSSING |
QA Service Level | 1 (Verified on 02/07/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Jason.Alsheikh@dot.ca.gov | Jason Alsheikh | Resident Engineer | Caltrans RE DB |
tan.cao@dot.ca.gov | Tan Cao | Structural Representative | Caltrans SR DB |
kenneth.yu@dot.ca.gov | Kenneth Yu | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 51-60 of 87 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-09-26-71 | 09/26/2024 | 10/01/2024 | Quality Assurance | Concrete | View |
2024-10-01-37 | 10/01/2024 | 10/03/2024 | Quality Assurance | Concrete | View |
2024-10-02-60 | 10/02/2024 | 10/07/2024 | Quality Assurance | Concrete | View |
2025-02-19-29 | 02/19/2025 | 02/24/2025 | Quality Assurance | Concrete | View |
2025-02-20-24 | 02/20/2025 | 02/24/2025 | Quality Assurance | Concrete | View |
2025-02-23-4 | 02/23/2025 | 02/28/2025 | Quality Assurance | Concrete | View |
2025-02-27-12 | 02/27/2025 | 03/04/2025 | Quality Assurance | Concrete | View |
2025-03-03-10 | 03/03/2025 | 03/05/2025 | Quality Assurance | Concrete | View |
2025-03-04-33 | 03/04/2025 | 03/07/2025 | Quality Assurance | Concrete | View |
2025-03-10-28 | 03/10/2025 | 03/18/2025 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods