Project Details
This page displays current information for project DIME:993496.
Project Information
Project Identifiers | Project ID: 993496 Permit Numbers: 1020NMC0853 1021NRT0929 |
---|---|
DIST-CO-RTE-PM | 10-SJ-5-16.5 |
Award Date | 04/21/2021 |
Closeout Date | Not set |
Work Description | Relocate and upgrade existing traffic signal poles, restripe traveled lanes, widen pavement and install curb. |
Location Description | SR 5, Lathrop |
QA Service Level | 1 (Verified on 01/03/2022) |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs submitted for this project.
Declaration Number | Program Operator | Material Type | Vendor | Submitted by |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods