Project Details
This page displays current information for project DEA: 061C4604.
Project Information
Project Identifiers | Project ID: 993471 DEA: 061C4604 EFIS: 0621000168 |
---|---|
DIST-CO-RTE-PM | 06-KER-223-R10.6/R20.1 |
Award Date | 02/10/2022 |
Closeout Date | 07/29/2022 |
Work Description | RESURFACE WITH HMA (TYPE A) AND POLYMER ASPHALT EMULSION SEAL COAT. |
Location Description | KERN COUNTY NEAR ARVIN FROM ROUTE 223/99 SEPARATION TO COMANCHE DRIVE |
QA Service Level | 1 (Verified on 01/03/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Amarjit.dhaliwal@dot.ca.gov | Amarjit Dhaliwal | Resident Engineer | Caltrans RE DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-7 of 7 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-05-25-65 | 05/25/2022 | 06/03/2022 | Department Acceptance | Asphaltic Emulsion | View |
2022-05-25-66 | 05/25/2022 | 06/03/2022 | Department Acceptance | Asphaltic Emulsion | View |
2022-05-24-23 | 05/24/2022 | 05/31/2022 | Department Acceptance | Asphaltic Emulsion | View |
2022-05-24-24 | 05/24/2022 | 05/31/2022 | Department Acceptance | Asphaltic Emulsion | View |
2022-05-17-38 | 05/17/2022 | 05/25/2022 | Department Acceptance | Asphaltic Emulsion | View |
2022-05-04-25 | 05/04/2022 | 05/10/2022 | Department Acceptance | Asphaltic Emulsion | View |
2022-05-04-26 | 05/04/2022 | 05/10/2022 | Department Acceptance | Asphaltic Emulsion | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods