Project Details
This page displays current information for project DEA: 060R1904.
Project Information
Project Identifiers | Project ID: 993386 DEA: 060R1904 EFIS: 0614000057 COOP: 061783 |
---|---|
DIST-CO-RTE-PM | 06-KER-184,223-L0.0/L0.3,R15.7/R16.3 |
Award Date | 01/25/2022 |
Closeout Date | 04/08/2024 |
Work Description | CONSTRUCT ROUNDABOUT, CURB RAMPS, AND LIGHTING SYSTEMS. |
Location Description | KERN COUNTY NEAR ARVIN ON ROUTE 184 FROM ROUTE 223 TO 0.3 MILE NORTH OF ROUTE 223 AND ON ROUTE 223 FROM 0.3 MILE WEST OF ROUTE 184 TO 0.3 MILE EAST OF ROUTE 184 |
QA Service Level | 1 (Verified on 11/15/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
amarjit.dhaliwal@dot.ca.gov | Amarjit Dhaliwal | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 35 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-04-15-4 | 04/15/2023 | 04/17/2023 | Department Acceptance | Aggregate | View |
2023-04-17-10 | 04/17/2023 | 04/18/2023 | Department Acceptance | Hot Mix Asphalt | View |
2023-04-17-11 | 04/17/2023 | 04/18/2023 | Department Acceptance | Hot Mix Asphalt | View |
2023-04-17-12 | 04/17/2023 | 04/17/2023 | Department Acceptance | Aggregate | View |
2023-04-18-6 | 04/18/2023 | 04/18/2023 | Department Acceptance | Soil | View |
2023-04-15-5 | 04/15/2023 | 04/25/2023 | Department Acceptance | Asphalt Binder | View |
2022-10-11-39 | 10/11/2022 | 10/17/2022 | Quality Assurance | Asphaltic Emulsion | View |
2022-10-11-40 | 10/11/2022 | 10/17/2022 | Quality Assurance | Asphalt Binder | View |
2023-01-12-2 | 01/12/2023 | 01/12/2023 | Quality Assurance | Concrete | View |
2023-01-12-3 | 01/12/2023 | 01/12/2023 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods