Project Details

This page displays current information for project DEA: 04264724.

Project Information

Project IdentifiersProject ID: 993333
DEA: 04264724
EFIS: 0419000068
DIST-CO-RTE-PM04-MRN-101-R20.8/27.1
Award Date04/26/2022
Closeout DateNot set
Work DescriptionCIP BRIDGES, CONSTRUCT ROADWAY, RETAINING WALLS AND MODIFY ELECTRICAL.
Location DescriptionMARIN COUNTY IN AND NEAR NOVATO FROM 0.1 MILE SOUTH OF FRANKLIN AVENUE OVERHEAD TO 0.5 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE
QA Service Level1 (Verified on 11/01/2021)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
Fabio.LaSerna@dot.ca.govFabio La SernaResident EngineerCaltrans RE DB
jeremy.light@dot.ca.govJeremy LightStructural RepresentativeCaltrans SR DB
waqas.ather@dot.ca.govWaqas AtherMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 211-220 of 672 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2024-06-12-11406/12/202406/12/2024Quality AssuranceSoilView
2024-06-10-13506/10/202406/10/2024Quality AssuranceSoilView
2024-06-10-13306/10/202406/10/2024Quality AssuranceSoilView
2024-06-10-13106/10/202406/10/2024Quality AssuranceSoilView
2024-06-07-11506/07/202406/08/2024Quality ControlConcreteView
2024-06-07-11406/07/202406/07/2024Quality ControlConcreteView
2024-06-07-11306/07/202406/05/2024Quality ControlAggregateView
2024-06-07-4906/07/202406/07/2024Quality AssuranceConcreteView
2024-06-07-4806/07/202406/07/2024Quality AssuranceConcreteView
2024-06-05-14106/05/202406/05/2024Quality ControlAggregateView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Displaying 1-10 of 43 results.
Declaration NumberMaterial TypeVendorSubmitted byQuantity
EPD-191Carbon Steel RebarCMC Steel ArizonaC&N Reinforcing (Dawnette Galicia)23,609 LBS
EPD-191Carbon Steel RebarCMC Steel ArizonaC&N Reinforcing (Dawnette Galicia)1723 LBS
EPD-191Carbon Steel RebarCMC Steel ArizonaC&N Reinforcing (Dawnette Galicia)34344 LBS
EPD-191Carbon Steel RebarCMC Steel ArizonaC&N Reinforcing (Dawnette Galicia)15926 LBS
EPD-191Carbon Steel RebarCMC Steel ArizonaC&N Reinforcing (Dawnette Galicia)18332 LBS
EPD-191Carbon Steel RebarCMC Steel ArizonaC&N Reinforcing (Dawnette Galicia)2754 LBS
EPD-191Carbon Steel RebarCMC Steel ArizonaC&N Reinforcing (Dawnette Galicia)33345 LBS
EPD-191Carbon Steel RebarCMC Steel ArizonaC&N Reinforcing (Dawnette Galicia)41541 LBS
EPD-191Carbon Steel RebarCMC Steel ArizonaC&N Reinforcing (Dawnette Galicia)12452 LBS
EPD-191Carbon Steel RebarCMC Steel ArizonaC&N Reinforcing (Dawnette Galicia)45870 LBS

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods