Project Details
This page displays current information for project DEA: 033F0604.
Project Information
Project Identifiers | Project ID: 993253 DEA: 033F0604 EFIS: 0312000052 |
---|---|
DIST-CO-RTE-PM | 03-GLE-162-76.3/78.6 |
Award Date | 02/02/2022 |
Closeout Date | Not set |
Work Description | Not set |
Location Description | Not set |
QA Service Level | 1 (Verified on 04/08/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Dustin.Watts@dot.ca.gov | Dustin Watts | Resident Engineer | Caltrans RE DB |
matt.crete@dot.ca.gov | Matt Crete | Structural Representative | Caltrans SR DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 111-120 of 128 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-11-10-2 | 11/10/2022 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2022-12-08-3 | 12/08/2022 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2022-12-29-4 | 12/29/2022 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2023-01-09-1 | 01/09/2023 | Quality Assurance | SMTL TM5 - Welded Hoops | View | |
2023-01-09-2 | 01/09/2023 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2023-01-31-2 | 01/31/2023 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2023-02-14-5 | 02/14/2023 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2024-09-04-8 | 09/04/2024 | Quality Assurance | Concrete | View | |
2024-09-06-21 | 09/06/2024 | Quality Assurance | Concrete | View | |
2024-09-20-14 | 09/20/2024 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods