Project Details
This page displays current information for project DEA: 07319104.
Project Information
Project Identifiers | Project ID: 993162 DEA: 07319104 EFIS: 0716000017 |
---|---|
DIST-CO-RTE-PM | 07-LA-91-R11.8 |
Award Date | 02/10/2022 |
Closeout Date | 01/11/2024 |
Work Description | ADJUST VERTICAL CLEARANCE WITH ROADWAY EXCAVATION AND PLACE JPCP. |
Location Description | LOS ANGELES COUNTY IN LONG BEACH AT NORTHBOUND ROUTE 710 TO EASTBOUND ROUTE 91 CONNECTOR |
QA Service Level | 1 (Verified on 11/30/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
thang.ton@dot.ca.gov | Thang Ton | Resident Engineer | Caltrans RE DB |
jeffrey.yu@dot.ca.gov | Jeffrey Yu | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 34 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-05-25-17 | 05/25/2022 | 05/25/2022 | Acceptance | Soil | View |
2022-07-24-6 | 07/24/2022 | 07/25/2022 | Acceptance | Concrete | View |
2022-07-24-7 | 07/24/2022 | 07/25/2022 | Acceptance | Concrete | View |
2022-07-24-8 | 07/24/2022 | 07/25/2022 | Acceptance | Concrete | View |
2022-07-24-9 | 07/24/2022 | 07/25/2022 | Acceptance | Concrete | View |
2022-08-16-59 | 08/16/2022 | 09/23/2022 | Acceptance | Aggregate | View |
2022-08-17-84 | 08/17/2022 | 08/25/2022 | Acceptance | Aggregate | View |
2022-08-17-91 | 08/17/2022 | 08/18/2022 | Acceptance | Concrete | View |
2022-08-17-92 | 08/17/2022 | 08/18/2022 | Acceptance | Concrete | View |
2022-09-08-59 | 09/08/2022 | 09/09/2022 | Acceptance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods