Project Details
This page displays current information for project DEA: 101F1704.
Project Information
Project Identifiers | Project ID: 993124 DEA: 101F1704 EFIS: 1016000032 |
---|---|
DIST-CO-RTE-PM | 10-SJ-26,99-1.1,19.3 |
Award Date | 09/07/2021 |
Closeout Date | 08/30/2023 |
Work Description | REMOVE AND REPLACE BRIDGE. |
Location Description | SAN JOAQUIN COUNTY NEAR STOCKTON AT ROUTE 26/99 SEPARATION |
QA Service Level | 1 (Verified on 07/23/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
troy.scheiber@dot.ca.gov | Troy Scheiber | Resident Engineer | Caltrans RE DB |
cpazzi@ghirardelliassoc.com | Chuck Pazzi | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 54 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-12-27-8 | 12/27/2021 | 01/10/2022 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2021-12-27-9 | 12/27/2021 | 01/10/2022 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2022-03-01-42 | 03/01/2022 | 03/07/2022 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2022-04-15-2 | 04/15/2022 | Quality Assurance | SMTL TM5 - Threaded Bar | View | |
2022-04-15-33 | 04/15/2022 | 04/21/2022 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2022-04-20-77 | 04/20/2022 | 04/20/2022 | Quality Control | Aggregate | View |
2022-04-20-78 | 04/20/2022 | 04/20/2022 | Quality Control | Aggregate | View |
2022-04-20-79 | 04/20/2022 | 04/20/2022 | Quality Control | Concrete | View |
2022-04-26-64 | 04/26/2022 | 07/26/2022 | Quality Control | Concrete | View |
2022-05-09-67 | 05/09/2022 | 05/09/2022 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods