Project Details
This page displays current information for project DEA: 031E1104.
Project Information
Project Identifiers | Project ID: 925 DEA: 031E1104 |
---|---|
DIST-CO-RTE-PM | 03-BUT-70,162-14.8,10.1 |
Award Date | 12/08/2010 |
Closeout Date | 12/17/2012 |
Work Description | INSTALL CABLE RESTRAINERS AND CONCRETE BLOCKS AT PIERS AND ABUTMENTS. |
Location Description | BUTTE COUNTY IN AND NEAR OROVILLE ON ROUTE 70 AT FEATHER RIVER BRIDGE AND ON ROUTE 162 AT THERMALITO AFTERBAY BRIDGE |
QA Service Level | 1 (Verified on 10/11/2010) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
justin_wood@dot.ca.gov | JUSTIN WOOD | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods