Project Details
This page displays current information for project DEA: 112T1824.
Project Information
Project Identifiers | Project ID: 7780 DEA: 112T1824 EFIS: 1100020051 |
---|---|
DIST-CO-RTE-PM | 11-SD-805-4.7/5.6 |
Award Date | 01/03/2013 |
Closeout Date | 09/07/2018 |
Work Description | REPLACE STRUCTURE AND CONSTRUCT DIRECT ACCESS RAMP (DAR). |
Location Description | SAN DIEGO COUNTY IN CHULA VISTA FROM 0.4 MILE SOUTH OF EAST PALOMAR STREET OVERCROSSING TO 0.1 MILE NORTH OF NAPLES STREET UNDERCROSSING |
QA Service Level | 1 (Verified on 12/10/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
Displaying 11-20 of 989 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2013-07-24-2521 | 07/24/2013 | 07/25/2013 | Quality Control | Concrete | View |
2013-07-24-8818 | 07/24/2013 | 07/24/2013 | Quality Control | Concrete | View |
2013-07-24-5899 | 07/24/2013 | 07/25/2013 | Quality Control | Concrete | View |
2013-07-30-5255194 | 07/30/2013 | 07/30/2013 | Quality Control | Aggregate | View |
2013-07-30-5259800 | 07/30/2013 | 07/30/2013 | Quality Control | Aggregate | View |
2013-07-30-6337281 | 07/30/2013 | 07/31/2013 | Quality Control | Concrete | View |
2013-07-30-8264432 | 07/30/2013 | 07/31/2013 | Quality Control | Concrete | View |
2013-07-30-10159786 | 07/30/2013 | 07/31/2013 | Quality Control | Concrete | View |
2013-07-30-8265063 | 07/30/2013 | Verification | Concrete | View | |
2013-07-30-8389116 | 07/30/2013 | Verification | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods