Project Details
This page displays current information for project DEA: 071218W4.
Project Information
| Project Identifiers | Project ID: 7613 DEA: 071218W4 EFIS: 0700021119 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5-29.4/31.6 |
| Award Date | 11/29/2012 |
| Closeout Date | 07/31/2023 |
| Work Description | REALIGN ROUTE 5 AND RAILROAD TRACKS AND RECONFIGURE ON- AND OFF-RAMPS. |
| Location Description | LOS ANGELES COUNTY IN BURBANK FROM WEST MAGNOLIA BOULEVARD OVERCROSSING TO 0.3 MILE NORTH OF BUENA VISTA STREET/WINONA AVENUE UNDERCROSSING |
| QA Service Level | 1 (Verified on 10/08/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| gchoi@prescienceusa.com | Gon Choi | Structural Representative | Caltrans SR DB |
| maziar.kazemian@dot.ca.gov | Maziar Kazemian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 191-200 of 317 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2016-02-18-5 | 02/18/2016 | 02/19/2016 | Quality Control | Concrete | View |
| 2016-02-18-6 | 02/18/2016 | 02/19/2016 | Quality Control | Concrete | View |
| 2016-03-17-2 | 03/17/2016 | 03/18/2016 | Quality Control | Concrete | View |
| 2016-04-25-1 | 04/25/2016 | 04/01/2016 | Quality Control | Concrete | View |
| 2016-03-25-5 | 03/25/2016 | 04/01/2016 | Quality Control | Concrete | View |
| 2016-03-31-1 | 03/31/2016 | 04/04/2016 | Quality Assurance | Concrete | View |
| 2016-03-31-2 | 03/31/2016 | 04/04/2016 | Quality Assurance | Concrete | View |
| 2016-03-30-1 | 03/30/2016 | 04/04/2016 | Quality Assurance | Concrete | View |
| 2016-04-06-9 | 04/06/2016 | 04/11/2016 | Quality Control | Concrete | View |
| 2016-04-06-10 | 04/06/2016 | 04/11/2016 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
