Project Details
This page displays current information for project DEA: 071218W4.
Project Information
Project Identifiers | Project ID: 7613 DEA: 071218W4 EFIS: 0700021119 |
---|---|
DIST-CO-RTE-PM | 07-LA-5-29.4/31.6 |
Award Date | 11/29/2012 |
Closeout Date | 07/31/2023 |
Work Description | REALIGN ROUTE 5 AND RAILROAD TRACKS AND RECONFIGURE ON- AND OFF-RAMPS. |
Location Description | LOS ANGELES COUNTY IN BURBANK FROM WEST MAGNOLIA BOULEVARD OVERCROSSING TO 0.3 MILE NORTH OF BUENA VISTA STREET/WINONA AVENUE UNDERCROSSING |
QA Service Level | 1 (Verified on 10/08/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
gchoi@prescienceusa.com | Gon Choi | Structural Representative | Caltrans SR DB |
jeffrey.yu@dot.ca.gov | Jeffrey Yu | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 161-170 of 317 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2016-05-11-7 | 05/11/2016 | 05/13/2016 | Department Acceptance | Soil | View |
2016-03-22-5 | 03/22/2016 | 03/29/2016 | Department Acceptance | Soil | View |
2016-05-11-6 | 05/11/2016 | 05/16/2016 | Quality Assurance | Concrete | View |
2016-05-06-4 | 05/06/2016 | 05/10/2016 | Quality Assurance | Concrete | View |
2016-05-04-7 | 05/04/2016 | 05/06/2016 | Quality Assurance | Concrete | View |
2016-05-04-6 | 05/04/2016 | 05/06/2016 | Quality Assurance | Concrete | View |
2016-04-28-9 | 04/28/2016 | 05/03/2016 | Quality Control | Concrete | View |
2016-04-25-4 | 04/25/2016 | 05/03/2016 | Quality Control | Concrete | View |
2016-04-29-1 | 04/29/2016 | 05/03/2016 | Quality Control | Concrete | View |
2016-04-14-4 | 04/14/2016 | 04/18/2016 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods