Project Details
This page displays current information for project DEA: 043A9224.
Project Information
Project Identifiers | Project ID: 7491 DEA: 043A9224 EFIS: 0412000340 |
---|---|
DIST-CO-RTE-PM | 04-ALA-880-24.0/25.5 |
Award Date | 11/08/2012 |
Closeout Date | 01/14/2016 |
Work Description | WIDEN MAINLINE AND BRIDGE FOR HOV LANE |
Location Description | ALAMEDA COUNTY FROM 0.2 MILE NORTH OF ROUTE 112/880 SEPARATION TO HEGENBERGER ROAD OVERCROSSING |
QA Service Level | 1 (Verified on 10/30/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
harpal.chahal@dot.ca.gov | Harpal Chahal | Resident Engineer | Caltrans RE DB |
peter.lam@dot.ca.gov | Peter Lam | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 15 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2014-09-22-6 | 09/22/2014 | 09/26/2014 | Verification | Concrete | View |
2014-09-03-5 | 09/03/2014 | 09/09/2014 | Quality Control | Concrete | View |
2014-08-28-8 | 08/28/2014 | 09/09/2014 | Quality Control | Concrete | View |
2014-08-27-6 | 08/27/2014 | 09/09/2014 | Quality Control | Concrete | View |
2014-08-26-3 | 08/26/2014 | 09/09/2014 | Quality Control | Concrete | View |
2014-08-26-4 | 08/26/2014 | 09/09/2014 | Quality Control | Concrete | View |
2014-08-22-1 | 08/22/2014 | 08/27/2014 | Quality Control | Concrete | View |
2014-08-22-2 | 08/22/2014 | 08/27/2014 | Quality Control | Concrete | View |
2014-08-21-4 | 08/21/2014 | 08/27/2014 | Quality Control | Concrete | View |
2014-08-21-5 | 08/21/2014 | 08/27/2014 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods