Project Details
This page displays current information for project EFIS: 0800020789.
Project Information
Project Identifiers | Project ID: 6957 EFIS: 0800020789 |
---|---|
DIST-CO-RTE-PM | 08-SBD-10-21.961/23.248 |
Award Date | 09/13/2011 |
Closeout Date | Not set |
Work Description | Enter onto Interstate 10 (I-10) right-of-way between Rancho Avenue and Mt. Vernon Avenue, in the City of Colton to construct Colton Crossing rail grade separation and associated drainage facilities, MSE wall and guard rail and pier protection wall, and try |
Location Description | I-10, Colton |
QA Service Level | 2 (Verified on 06/24/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
malarcon@athalyeinc.com | Mario Alarcon | Oversight Structural Representative | Caltrans SRO DB |
julien.atallah@dot.ca.gov | Julien Atallah | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods