Project Details
This page displays current information for project DEA: 11244304.
Project Information
Project Identifiers | Project ID: 6054 DEA: 11244304 |
---|---|
DIST-CO-RTE-PM | 11-SD-78-12.91-15.49 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | To Construct Two Railroad Bridges for the Sprinter Commuter Rail Project in City of San Marcos NCTD San Marcos Loop Br. No. 57-1105, Br. No. 57-1106 |
Location Description | State Highway right of way in the County of San Diego, City of San Marcos, on State Route 78, post mile 12.91-15.49 |
QA Service Level | 1 (Verified on 10/26/2005) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
julien.atallah@dot.ca.gov | Julien Atallah | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods