Project Details
This page displays current information for project DEA: 080P3704.
Project Information
Project Identifiers | Project ID: 5141 DEA: 080P3704 |
---|---|
DIST-CO-RTE-PM | 08-SBD-83,210-0.0/7.2,30.2/33.2 |
Award Date | 04/14/2011 |
Closeout Date | 08/09/2011 |
Work Description | REPLACE ASPHALT CONCRETE AND FOG SEAL |
Location Description | SAN BERNARDINO COUNTY IN CHINO AND SAN BERNARDINO ON ROUTE 38 FROM THE 71/83 SEPARATION TO ROUTE 60/83 SEPARATION AND ON ROUTE 210 FROM 5TH STREET UNDER CROSSING TO ROUTE 210/10 SEPARATION |
QA Service Level | 1 (Verified on 01/05/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods