Project Details
This page displays current information for project DEA: 072159C4.
Project Information
Project Identifiers | Project ID: 3959 DEA: 072159C4 EFIS: 0700000339 |
---|---|
DIST-CO-RTE-PM | 07-LA-5-001.8/003.0 |
Award Date | 08/19/2011 |
Closeout Date | 08/16/2018 |
Work Description | CARMENITA INTERCHANGE IMPROVEMENT |
Location Description | LOS ANGELES COUNTY IN SANTA FE SPRINGS AND NORWALK FROM ALONDRA BOULEVARD OVERCROSSING TO SHOEMAKER AVENUE OVERCROSSING |
QA Service Level | 1 (Verified on 05/01/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
peter.m.lee@dot.ca.gov | Peter M. Lee | Resident Engineer | Caltrans RE DB |
bassem_a_kabbara@dot.ca.gov | Bassem Kabbara | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 26 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2015-03-09-3 | 03/09/2015 | 03/11/2015 | Quality Control | Concrete | View |
2015-03-06-3 | 03/06/2015 | 03/11/2015 | Quality Control | Concrete | View |
2015-02-26-6 | 02/26/2015 | 03/11/2015 | Quality Control | Concrete | View |
2015-03-18-3 | 03/18/2015 | 03/23/2015 | Quality Control | Concrete | View |
2015-03-18-4 | 03/18/2015 | 03/24/2015 | Quality Control | Concrete | View |
2015-03-19-5 | 03/19/2015 | 03/24/2015 | Quality Control | Concrete | View |
2015-04-16-1 | 04/16/2015 | 04/17/2015 | Quality Control | Concrete | View |
2015-04-16-2 | 04/16/2015 | 04/17/2015 | Quality Control | Concrete | View |
2015-04-16-3 | 04/16/2015 | 04/20/2015 | Quality Control | Concrete | View |
2015-04-27-10 | 04/27/2015 | 05/01/2015 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods