Project Details
This page displays current information for project DEA: 07121844.
Project Information
Project Identifiers | Project ID: 3807 DEA: 07121844 EFIS: 0700000117 |
---|---|
DIST-CO-RTE-PM | 07-LA-5-42.8/47.3 |
Award Date | 12/06/2010 |
Closeout Date | 06/30/2021 |
Work Description | CONSTRUCT HOV LANES, RETAINING WALLS AND SOUND WALLS. |
Location Description | LOS ANGELES COUNTY IN LOS ANGELES, GLENDALE, AND BURBANK FROM ROUTE 5/134 SEPARATION TO MAGNOLIA BOULEVARD OVERCROSSING |
QA Service Level | 1 (Verified on 02/23/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
james.w.shih@dot.ca.gov | James Shih | Resident Engineer | Caltrans RE DB |
matthew.remo@dot.ca.gov | Matthew Remo | Structural Representative | Caltrans SR DB |
raymond.aludino@dot.ca.gov | Raymond Aludino | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 58 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2015-08-06-7 | 08/06/2015 | 08/11/2015 | Quality Control | Concrete | View |
2015-08-18-3 | 08/18/2015 | 08/25/2015 | Quality Control | Concrete | View |
2015-08-26-4 | 08/26/2015 | 09/02/2015 | Quality Control | Concrete | View |
2015-08-27-4 | 08/27/2015 | 09/02/2015 | Quality Control | Concrete | View |
2015-08-27-5 | 08/27/2015 | 09/02/2015 | Quality Control | Concrete | View |
2015-09-03-7 | 09/03/2015 | 09/11/2015 | Quality Control | Concrete | View |
2015-09-18-1 | 09/18/2015 | 09/22/2015 | Quality Control | Concrete | View |
2015-09-18-2 | 09/18/2015 | 09/22/2015 | Quality Control | Concrete | View |
2015-10-05-2 | 10/05/2015 | 10/08/2015 | Quality Control | Concrete | View |
2017-09-08-11 | 09/08/2017 | 09/29/2017 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods