Project Details
This page displays current information for project EFIS: 0000001155.
Project Information
Project Identifiers | Project ID: 2513 EFIS: 0000001155 Permit Numbers: 0508NMC0168 |
---|---|
DIST-CO-RTE-PM | 05-SCR-1-17.42 |
Award Date | 05/07/2009 |
Closeout Date | 04/29/2011 |
Work Description | Construction of a 11.5′ wide bike path, 133′ long retaining wall,, 292′ long cut-off wall, a 54′ long, 10′ wide prefabricated bicycle-pedestrian bridge under San Lorenzo Bridge on Highway 1. |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
ignacio.saavedra@dot.ca.gov | Ignacio Saavedra | Resident Engineer | Caltrans RE DB |
shewchuk@pbworld.com | Bruce Shewchuk | Oversight Resident Engineer | Caltrans REO DB |
david_galarza@dot.ca.gov | David Galarza | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods