Project Details
This page displays current information for project DEA: 060U79U4.
Project Information
Project Identifiers | Project ID: 215812 DEA: 060U79U4 EFIS: 0620000035 |
---|---|
DIST-CO-RTE-PM | 06-KIN-198-R16.9/R21.9 |
Award Date | 08/26/2021 |
Closeout Date | 05/10/2023 |
Work Description | CONSTRUCT GORE PAVING, SLOPE PAVING AND IRRIGATION UPGRADES. |
Location Description | KINGS COUNTY IN AND NEAR HANFORD FROM 12TH AVENUE OVERCROSSING TO 0.9 MILE EAST OF STATE ROUTE 43/198 SEPARATION |
QA Service Level | 1 (Verified on 07/12/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Pedro.Miguel@dot.ca.gov | Pedro Miguel | Resident Engineer | Caltrans RE DB |
Robert.Powell@dot.ca.gov | Robert Powell | Structural Representative | Caltrans SR DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-04-26-35 | 04/26/2022 | 05/06/2022 | Department Acceptance | Asphalt Binder | View |
2022-04-27-26 | 04/27/2022 | 05/06/2022 | Department Acceptance | Asphalt Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods