Project Details
This page displays current information for project DEA: 033H3304.
Project Information
Project Identifiers | Project ID: 215783 DEA: 033H3304 EFIS: 0317000325 |
---|---|
DIST-CO-RTE-PM | 03-YOL,SAC-50-2.5/3.2,L0.0/18.3 |
Award Date | 08/20/2021 |
Closeout Date | 01/22/2024 |
Work Description | INSTALL CMS, FIBER OPTIC CABLE SYSTEMS AND CAMERA SYSTEMS. |
Location Description | YOLO COUNTY AND SACRAMENTO COUNTY ON ROUTE 50 FROM JEFFERSON BOULEVARD TO 1.3 MILES EAST OF FOLSOM BOULEVARD |
QA Service Level | 1 (Verified on 07/26/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jody.phillips@dot.ca.gov | Jody Phillips | Resident Engineer | Caltrans RE DB |
dave.carlin@dot.ca.gov | David Carlin | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 121-129 of 129 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-04-01-34 | 04/01/2022 | 04/01/2022 | Quality Control | Aggregate | View |
2022-04-01-33 | 04/01/2022 | 04/01/2022 | Quality Control | Aggregate | View |
2022-06-06-7 | 06/06/2022 | 06/07/2022 | Quality Assurance | SMTL TM5 - Couplers | View |
2022-05-16-31 | 05/16/2022 | 05/20/2022 | Quality Assurance | Concrete | View |
2022-05-16-30 | 05/16/2022 | 05/20/2022 | Quality Assurance | Concrete | View |
2022-04-15-27 | 04/15/2022 | 04/18/2022 | Quality Assurance | Concrete | View |
2022-04-13-12 | 04/13/2022 | 04/14/2022 | Quality Assurance | Concrete | View |
2022-03-22-18 | 03/22/2022 | 03/30/2022 | Quality Assurance | Concrete | View |
2022-03-22-17 | 03/22/2022 | 03/30/2022 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods