Project Details
This page displays current information for project DEA: 050N72U4.
Project Information
| Project Identifiers | Project ID: 215753 DEA: 050N72U4 EFIS: 0520000169 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-101-4.4/R7.7 |
| Award Date | 03/01/2021 |
| Closeout Date | Not set |
| Work Description | Please cc Office Engineer Ni Nyoman Paul on reports sent to RE and SR. Construct High Occupancy Vehicle (HOV) lanes on U.S. Route 101 and rehabilitation - Segment 4B. |
| Location Description | 101 freeway in Summerland, CA |
| QA Service Level | 1 (Verified on 05/06/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| luobao.cai@dot.ca.gov | Luobao Cai | Resident Engineer | Caltrans RE DB |
| emiliano.berntsen@dot.ca.gov | Emiliano Berntsen | Structural Representative | Caltrans SR DB |
| saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 791-800 of 1235 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-02-09-46 | 02/09/2023 | 02/09/2023 | Quality Assurance | Concrete | View |
| 2023-02-15-28 | 02/15/2023 | 02/15/2023 | Quality Assurance | Concrete | View |
| 2023-01-24-27 | 01/24/2023 | 02/21/2023 | Quality Assurance | Concrete | View |
| 2023-01-24-28 | 01/24/2023 | 01/24/2023 | Quality Assurance | Concrete | View |
| 2023-02-21-23 | 02/21/2023 | 02/21/2023 | Quality Assurance | Concrete | View |
| 2023-02-22-30 | 02/22/2023 | 02/22/2023 | Quality Assurance | Concrete | View |
| 2023-01-26-76 | 01/26/2023 | 02/23/2023 | Quality Assurance | Concrete | View |
| 2023-01-27-42 | 01/27/2023 | 02/24/2023 | Quality Assurance | Concrete | View |
| 2023-01-26-77 | 01/26/2023 | 01/26/2023 | Quality Assurance | Concrete | View |
| 2023-01-27-43 | 01/27/2023 | 01/27/2023 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
