Project Details

This page displays current information for project DEA: 033H93U4.

Project Information

Project IdentifiersProject ID: 215744
DEA: 033H93U4
EFIS: 0321000091
DIST-CO-RTE-PM03-YUB,BUT-70-25.5/25.8,0.0/3.8
Award Date07/15/2021
Closeout DateNot set
Work DescriptionWIDEN ROADWAY & SHOULDER, ADD TURN LANES & CONSTRUCT BRIDGE.
Location DescriptionYUBA AND BUTTE COUNTIES ABOUT 11 MILES NORTH OF MARYSVILLE FROM 0.8 MILE NORTH OF CHANDLER ROAD TO 0.2 MILE SOUTH OF EAST GRIDLEY ROAD
QA Service Level1 (Verified on 05/20/2021)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
anthony.granados@dot.ca.govAnthony GranadosResident EngineerCaltrans RE DB
matt.crete@dot.ca.govMatt CreteStructural RepresentativeCaltrans SR DB
donald.adams@dot.ca.govDonald AdamsMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 99 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2021-09-27-7009/27/202109/28/2021VerificationAggregateView
2021-09-27-7109/27/202109/28/2021VerificationReclaimed Asphalt PavementView
2021-09-27-7209/27/202109/28/2021VerificationHot Mix AsphaltView
2021-09-27-7309/27/202112/28/2021VerificationAsphalt BinderView
2021-11-23-111/23/202111/29/2021Quality AssuranceSMTL TM5 - Welded HoopsView
2021-11-23-211/23/2021Quality ControlSMTL TM5 - Welded HoopsView
2021-12-03-512/03/202112/06/2021Quality AssuranceSMTL TM5 - Welded HoopsView
2021-12-03-612/03/202112/06/2021Quality ControlSMTL TM5 - Welded HoopsView
2021-12-03-1912/03/202112/07/2021Quality AssuranceSMTL TM5 - CouplersView
2021-12-07-412/07/202112/13/2021Quality AssuranceSMTL TM5 - Welded HoopsView

Job Mix Formula (JMF)

JMFs associated with this project.

Displaying 1-2 of 2 results.
JMF IDStatusSubmitted ByCreated ByDate CreatedLink
JMF3511-23-2023-46Submittal Authorized For Use CT D03 - Olivehurst Northern Regional Laboratory10/20/2023View
JMF3511-23-2021-103Submittal Authorized For Use CT D03 - Olivehurst Northern Regional Laboratory12/27/2021View

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods