Project Details
This page displays current information for project DEA: 01366004.
Project Information
Project Identifiers | Project ID: 215741 DEA: 01366004 EFIS: 0100000127 |
---|---|
DIST-CO-RTE-PM | 01-HUM-101-80.0/84.0 |
Award Date | 12/29/2022 |
Closeout Date | Not set |
Work Description | Indianola Cutoff UC |
Location Description | HUMBOLDT COUNTY NEAR EUREKA FROM EUREKA SLOUGH BRIDGE TO BAYSIDE CUTOFF |
QA Service Level | 1 (Verified on 05/17/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
brenda.howell@dot.ca.gov | Brenda Howell | Resident Engineer | Caltrans RE DB |
jarred.burrows@dot.ca.gov | Jarred Burrows | Structural Representative | Caltrans SR DB |
peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 51 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-04-16-2 | 04/16/2024 | 04/19/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2024-04-09-3 | 04/09/2024 | 04/10/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2024-04-04-1 | 04/04/2024 | 04/10/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2024-04-02-4 | 04/02/2024 | 04/03/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2024-02-27-2 | 02/27/2024 | 02/29/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2024-02-21-3 | 02/21/2024 | 02/22/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2024-02-13-1 | 02/13/2024 | 02/14/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2023-10-03-12 | 10/03/2023 | 10/04/2023 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2023-09-08-32 | 09/08/2023 | 09/12/2023 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2023-09-01-3 | 09/01/2023 | 09/06/2023 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-8 of 8 results.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
4790066131.101.1 | Carbon Steel Rebar | Cascade Steel Rolling Mills, Incorporated | C&N Reinforcing (Dawnette Galicia) | 25152 LBS |
4790066131.101.1 | Carbon Steel Rebar | Cascade Steel Rolling Mills, Incorporated | C&N Reinforcing (Dawnette Galicia) | 23712 LBS |
4790066131.101.1 | Carbon Steel Rebar | Cascade Steel Rolling Mills, Incorporated | C&N Reinforcing (Dawnette Galicia) | 23712 LBS |
4790066131.101.1 | Carbon Steel Rebar | Cascade Steel Rolling Mills, Incorporated | C&N Reinforcing (Dawnette Galicia) | 23712 LBS |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | C&N Reinforcing (Dawnette Galicia) | 14448 LBS |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | C&N Reinforcing (Dawnette Galicia) | 12648 LBS |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | C&N Reinforcing (Dawnette Galicia) | 12648 LBS |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | C&N Reinforcing (Dawnette Galicia) | 12648 LBS |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods