Project Details
This page displays current information for project DEA: 010G2104.
Project Information
Project Identifiers | Project ID: 215739 DEA: 010G2104 EFIS: 0116000137 |
---|---|
DIST-CO-RTE-PM | 01-DN-101-21.2 |
Award Date | 07/15/2021 |
Closeout Date | 06/22/2023 |
Work Description | CONSTRUCT RETAINING WALL AND GUARDRAIL AND EARTHWORK. |
Location Description | DEL NORTE COUNTY NEAR CRESCENT CITY AT 0.2 MILE NORTH OF CUSHING CREEK VIADUCT 01-0076 |
QA Service Level | 1 (Verified on 05/17/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Aaron.Valley@dot.ca.gov | Aaron Valley | Resident Engineer | Caltrans RE DB |
thomas.norris@dot.ca.gov | Thomas Norris | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-4 of 4 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-01-26-38 | 01/26/2023 | 01/30/2023 | Verification | Concrete | View |
2022-08-26-50 | 08/26/2022 | 08/31/2022 | Department Acceptance | Asphalt Binder | View |
2022-06-13-37 | 06/13/2022 | 06/14/2022 | Quality Control | Polyester | View |
2017-09-12-19 | 09/12/2017 | 02/25/2022 | Quality Assurance | SMTL TM6 - Ductile Iron Cast Samples | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods